Integrated engineering and execution of the potable water, sanitary, stormwater and fire protection networks of a 12,000 m² corporate building, with BIM coordination across disciplines.
A 12-storey corporate building with 3 basement parking levels needed a single party responsible for all of its hydraulic installations: potable water, sewage and greywater, stormwater drainage and fire protection. The construction schedule was tight and clashes between disciplines had to be solved before reaching the field.


“Solving hydrosanitary and fire protection with the same engineering team avoids the problems that appear when everyone only looks at their own pipe.” — HWDE Engineering
Design, supply and installation of the sprinkler network, fire pump room and detection and alarm system of an 18,500 m² manufacturing plant, under NFPA 13, 20 and 72.
Replacement of an obsolete suppression system with a clean agent system per NFPA 2001 in a data center, with room integrity testing and a predictive maintenance plan.
• From risk analysis to the maintenance of your fire protection or hydrosanitary system, we are ready to support you. Write to us today and schedule a technical consultation with our engineers.