Replacement of an obsolete suppression system with a clean agent system per NFPA 2001 in a data center, with room integrity testing and a predictive maintenance plan.
The data center of a services company was running a suppression system installed more than 15 years ago, with no maintenance records and an agent no longer compliant. Any intervention had to be carried out without interrupting the operation of the critical equipment.

“Maintaining a system we did not install starts with telling the truth about its condition.” — HWDE Engineering
Integrated engineering and execution of the potable water, sanitary, stormwater and fire protection networks of a 12,000 m² corporate building, with BIM coordination across disciplines.
Complete fire pump room, hydrant and monitor network, and acceptance testing for a 42,000 m² distribution center with high-bay racking.
• From risk analysis to the maintenance of your fire protection or hydrosanitary system, we are ready to support you. Write to us today and schedule a technical consultation with our engineers.